ITAC Assessment: SD0154
ITAC logo
ITAC Assessment: SD0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Medical Instruments and Fiberglass Arm Casts
NAICS
n/a
SIC 3847:
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 72,000
ft2
Annual Production 17,000,000
pieces
Production Hrs. Annual 6,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,411 2,993,259
kWh
Electricity Demand $70,198 6,908
kW-mo/yr
Electricity Fees $279,609 -
Natural Gas $61,287 9,938
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
01 2.4133: Use most efficient type of electric motors $2,178 $1,360 $2,178
25,205
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,982 $400 - $8,982
-
kW-mo/yr
- - -
03 2.4226: Use / purchase optimum sized compressor $7,082 $8,500 - $7,082
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,750 $40 - $1,750
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $3,032 $1,127 - - $3,032
-
MMBtu
- -
06 2.2437: Recover waste heat from equipment $2,485 $1,127 - - $2,485
-
MMBtu
- -
07 2.2443: Re-use or recycle hot or cold process exhaust air $1,053 $1,127 - - $1,053
-
MMBtu
- -
08 3.5112: Reprocess spent oils on site for re-use $9,000 $6,000 - - - $9,000
-
gal
-
09 3.6192: Use a less expensive method of waste removal $3,250 $4,000 - - - - $3,250
-
lb
TOTAL RECOMMENDED $38,812 $23,681 $2,178
25,205
kWh
$17,814
-
kW-mo/yr
$6,570
-
MMBtu
$9,000
-
gal
$3,250
-
lb
TOTAL IMPLEMENTED $38,812 $23,681 $2,178
25,205
kWh
$17,814
-
kW-mo/yr
$6,570
-
MMBtu
$9,000
-
gal
$3,250
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs