ITAC Assessment: IA0077
ITAC logo
ITAC Assessment: IA0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product chairs
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 420
Plant Area 218,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,968
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,378 4,689,625
kWh
Natural Gas $106,303 27,382
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $27,930 $11,700 - - $27,930
02 2.3212: Optimize plant power factor $5,776 $13,208 $5,776
-
kWh
- -
03 2.7243: Improve air circulation with destratification fans / other methods $3,607 $1,750 - $3,607
-
MMBtu
-
04 2.7135: Install occupancy sensors $692 $723 $692
13,189
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $609 $100 $609
11,430
kWh
- -
TOTAL RECOMMENDED $38,614 $27,481 $7,077
24,619
kWh
$3,607
-
MMBtu
$27,930
TOTAL IMPLEMENTED $6,385 $13,308 $6,385
11,430
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs