Assessment Year | 1996 |
---|---|
Principal Product | Meat & Bone Meal., Yellow Grease, Tallow |
NAICS |
n/a
|
SIC | 2077: Animal and Marine Fats and Oils |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
50,000
ft2
|
Annual Production | 208,000,000
lb
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $302,105 | 5,750,879 |
kWh
|
$0.053 |
Electricity Demand | $256,403 | 16,562 |
kW-mo/yr
|
$15.48 |
Natural Gas | $503,663 | 238,219 |
MMBtu
|
$2.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,619 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,619 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $9,156 | $15,120 |
$9,156
114,302
kWh
|
- | - | - | |
02 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $35,224 | $55,000 | - |
$35,224
-
MMBtu
|
- | - | |
03 | 2.2511: Insulate bare equipment | $779 | $1,700 | - |
$779
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $2,036 | $4,869 | - |
$2,036
-
MMBtu
|
- | - | |
05 | 2.2135: Repair and eliminate steam leaks | $819 | $300 | - |
$819
-
MMBtu
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,547 | $2,779 |
$1,547
16,120
kWh
|
- | - | - | |
07 | 2.7144: Install spectral reflectors / delamp | $4,917 | $4,005 |
$4,917
52,169
kWh
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $1,301 | $952 |
$1,301
12,603
kWh
|
- | - | - | |
09 | 4.231: Purchase equipment instead of leasing | $13,340 | $11,000 | - | - | - | $13,340 | |
10 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $1,500 | - | - | - |
$1,500
-
lb
|
- | |
TOTAL RECOMMENDED | $70,619 | $95,725 |
$16,921
195,194
kWh
|
$38,858
-
MMBtu
|
$1,500
-
lb
|
$13,340 | ||
TOTAL IMPLEMENTED | $70,619 | $95,725 |
$16,921
195,194
kWh
|
$38,858
-
MMBtu
|
$1,500
-
lb
|
$13,340 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs