Assessment Year | 1996 |
---|---|
Principal Product | Chrome and Zinc Plated Products |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
38,000
ft2
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,547 | 3,556,858 |
kWh
|
$0.036 |
Electricity Demand | $98,011 | 9,806 |
kW-mo/yr
|
$10.00 |
Natural Gas | $107,546 | 16,004 |
MMBtu
|
$6.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,368 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,368 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $857 | $150 |
$857
13,189
kWh
|
- | - | |
02 | 2.2511: Insulate bare equipment | $530 | $659 | - |
$530
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $515 | $564 |
$515
7,913
kWh
|
- | - | |
04 | 2.7144: Install spectral reflectors / delamp | $373 | $710 |
$373
5,275
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $595 | $394 |
$595
9,086
kWh
|
- | - | |
06 | 3.1244: Reduce solution drag-out to prevent solution loss | $26,498 | - | - | - |
$26,498
-
gal
|
|
TOTAL RECOMMENDED | $29,368 | $2,477 |
$2,340
35,463
kWh
|
$530
-
MMBtu
|
$26,498
-
gal
|
||
TOTAL IMPLEMENTED | $29,368 | $2,477 |
$2,340
35,463
kWh
|
$530
-
MMBtu
|
$26,498
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs