ITAC Assessment: SD0139
ITAC logo
ITAC Assessment: SD0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cast Aluminum Wheels For Autos and Light Trucks
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 120,000
ft2
Annual Production 240,000
lb
Production Hrs. Annual 12,375
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,190 3,061,841
kWh
Electricity Demand $114,337 8,389
kW-mo/yr
Natural Gas $184,068 57,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,347

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $4,319 $5,940 $4,319
53,634
kWh
- -
02 2.2414: Use waste heat from hot flue gases to preheat $4,093 $10,000 - $4,093
-
MMBtu
-
03 2.2511: Insulate bare equipment $752 $554 - $752
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $858 $600 $858
13,189
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,154 $3,613 $2,154
23,447
kWh
- -
06 2.7144: Install spectral reflectors / delamp $1,600 $1,830 $1,600
15,240
kWh
- -
07 2.7135: Install occupancy sensors $635 $1,010 $635
5,275
kWh
- -
08 3.1171: Change product specs $15,936 $5,000 - - $15,936
TOTAL RECOMMENDED $30,347 $28,547 $9,566
110,785
kWh
$4,845
-
MMBtu
$15,936
TOTAL IMPLEMENTED $30,347 $28,547 $9,566
110,785
kWh
$4,845
-
MMBtu
$15,936
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs