ITAC Assessment: SD0124
ITAC logo
ITAC Assessment: SD0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Laser Systems for Military Training
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 111,500
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $544,235 4,608,734
kWh
Natural Gas $47,598 6,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $140,074 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $3,576 $4,090 $3,576
25,498
kWh
- -
02 2.4226: Use / purchase optimum sized compressor $4,134 $2,800 $4,134
14,654
kWh
- -
03 2.8114: Change rate schedules or other changes in utility service $66,089 $22,000 $66,089
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $25,030 $55,699 $25,030
176,143
kWh
- -
05 2.7144: Install spectral reflectors / delamp $34,416 $30,660 $34,416
242,087
kWh
- -
06 3.2141: Use cylindrical tanks with height to diameter ratios close to one to reduce wetted surface $1,558 $900 - - $1,558
-
lb
07 3.6112: Use filter and drying oven to reduce sludge volume $1,415 $3,000 - $1,415
-
gal
-
08 3.5315: Lease / purchase baler; sell cardboard to recycler $3,856 - - - $3,856
-
lb
TOTAL RECOMMENDED $140,074 $119,149 $133,245
458,382
kWh
$1,415
-
gal
$5,414
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs