Assessment Year | 1995 |
---|---|
Principal Product | Laser Systems for Military Training |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
111,500
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $544,235 | 4,608,734 |
kWh
|
$0.12 |
Natural Gas | $47,598 | 6,926 |
MMBtu
|
$6.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $140,074 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,576 | $4,090 |
$3,576
25,498
kWh
|
- | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $4,134 | $2,800 |
$4,134
14,654
kWh
|
- | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $66,089 | $22,000 |
$66,089
-
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,030 | $55,699 |
$25,030
176,143
kWh
|
- | - | |
05 | 2.7144: Install spectral reflectors / delamp | $34,416 | $30,660 |
$34,416
242,087
kWh
|
- | - | |
06 | 3.2141: Use cylindrical tanks with height to diameter ratios close to one to reduce wetted surface | $1,558 | $900 | - | - |
$1,558
-
lb
|
|
07 | 3.6112: Use filter and drying oven to reduce sludge volume | $1,415 | $3,000 | - |
$1,415
-
gal
|
- | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,856 | - | - | - |
$3,856
-
lb
|
|
TOTAL RECOMMENDED | $140,074 | $119,149 |
$133,245
458,382
kWh
|
$1,415
-
gal
|
$5,414
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs