ITAC Assessment: SD0118
ITAC logo
ITAC Assessment: SD0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sport Cutlery and Pocket Knives
NAICS
n/a
SIC 3421: Cutlery
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 157,000
ft2
Annual Production 480,000
units
Production Hrs. Annual 4,580
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,558 4,048,359
kWh
Natural Gas $9,275 1,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Other Liquid (haz) Savings
01 2.4321: Upgrade obsolete equipment $8,154 $15,000 $8,154
87,632
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,560 $20 $3,560
38,394
kWh
- -
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $202 $300 $202
2,052
kWh
- -
04 2.7134: Use photocell controls $774 $140 $774
8,206
kWh
- -
05 2.7132: Install timers on light switches in little used areas $578 $100 $578
4,396
kWh
- -
06 2.7261: Install timers and/or thermostats $6,794 $1,430 $6,794
150,352
kWh
- -
07 3.6123: Burn wood by-products for heat $9,000 $5,000 - - $9,000
-
gal
08 3.7141: Improve cleaning efficiency by maintaining cleaning system $3,902 $500 - $3,902
-
Tgal
-
TOTAL RECOMMENDED $32,964 $22,490 $20,062
291,032
kWh
$3,902
-
Tgal
$9,000
-
gal
TOTAL IMPLEMENTED $23,964 $17,490 $20,062
291,032
kWh
$3,902
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs