ITAC Assessment: SD0109
ITAC logo
ITAC Assessment: SD0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Cosmetic Products
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 54,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 3,121
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,114 485,053
kWh
Natural Gas $11,975 1,698
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,711 $2,210 $1,711
14,947
kWh
-
02 2.2136: Install / repair insulation on steam lines $6,116 $2,503 - $6,116
-
MMBtu
03 2.4226: Use / purchase optimum sized compressor $1,269 $1,000 $1,269
10,844
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,551 $20 $2,551
21,981
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,789 $8,296 $3,789
33,118
kWh
-
06 2.7144: Install spectral reflectors / delamp $6,465 $8,175 $6,465
52,462
kWh
-
07 2.7135: Install occupancy sensors $725 $648 $725
5,862
kWh
-
08 2.7134: Use photocell controls $1,110 $161 $1,110
8,499
kWh
-
09 2.7145: Install skylights $967 $1,662 $967
7,913
kWh
-
TOTAL RECOMMENDED $24,703 $24,675 $18,587
155,626
kWh
$6,116
-
MMBtu
TOTAL IMPLEMENTED $17,513 $15,852 $11,397
97,302
kWh
$6,116
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs