| Assessment Year | 1995 |
|---|---|
| Principal Product | Cosmetic Products |
| NAICS |
n/a
|
| SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
54,000
ft2
|
| Annual Production | 15,000,000
pieces
|
| Production Hrs. Annual | 3,121
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,114 | 485,053 |
kWh
|
$0.12 |
| Natural Gas | $11,975 | 1,698 |
MMBtu
|
$7.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,703 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,513 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,711 | $2,210 |
$1,711
14,947
kWh
|
- | |
| 02 | 2.2136: Install / repair insulation on steam lines | $6,116 | $2,503 | - |
$6,116
-
MMBtu
|
|
| 03 | 2.4226: Use / purchase optimum sized compressor | $1,269 | $1,000 |
$1,269
10,844
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,551 | $20 |
$2,551
21,981
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,789 | $8,296 |
$3,789
33,118
kWh
|
- | |
| 06 | 2.7144: Install spectral reflectors / delamp | $6,465 | $8,175 |
$6,465
52,462
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $725 | $648 |
$725
5,862
kWh
|
- | |
| 08 | 2.7134: Use photocell controls | $1,110 | $161 |
$1,110
8,499
kWh
|
- | |
| 09 | 2.7145: Install skylights | $967 | $1,662 |
$967
7,913
kWh
|
- | |
| TOTAL RECOMMENDED | $24,703 | $24,675 |
$18,587
155,626
kWh
|
$6,116
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,513 | $15,852 |
$11,397
97,302
kWh
|
$6,116
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs