| Assessment Year | 1995 |
|---|---|
| Principal Product | Metal Cans |
| NAICS |
n/a
|
| SIC | 3411: Metal Cans |
| Sales Range | $10 M to 50M |
| # of Employees | 134 |
| Plant Area |
420,000
ft2
|
| Annual Production | 42,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $705,292 | 7,170,575 |
kWh
|
$0.098 |
| Natural Gas | $373,846 | 89,612 |
MMBtu
|
$4.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $199,252 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $172,749 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $8,588 | $14,400 |
$8,588
87,339
kWh
|
- | - | |
| 02 | 2.8114: Change rate schedules or other changes in utility service | $94,795 | $22,000 | - | - | $94,795 | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $9,603 | $4,100 |
$9,603
97,597
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,270 | $62,889 |
$32,270
325,029
kWh
|
- | - | |
| 05 | 2.7144: Install spectral reflectors / delamp | $25,421 | $23,285 |
$25,421
240,621
kWh
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $2,466 | $2,184 |
$2,466
23,154
kWh
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $9,209 | $1,260 |
$9,209
81,770
kWh
|
- | - | |
| 08 | 3.4115: Recover and reuse cooling water | $8,450 | $5,000 | - |
$8,450
-
Tgal
|
- | |
| 09 | 3.4115: Recover and reuse cooling water | $8,450 | $4,885 | - |
$8,450
-
Tgal
|
- | |
| TOTAL RECOMMENDED | $199,252 | $140,003 |
$87,557
855,510
kWh
|
$16,900
-
Tgal
|
$94,795 | ||
| TOTAL IMPLEMENTED | $172,749 | $126,018 |
$77,954
757,913
kWh
|
- | $94,795 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs