Assessment Year | 1994 |
---|---|
Principal Product | Water Filtration Equipment |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 37 |
Plant Area |
49,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,989 | 277,550 |
kWh
|
$0.12 |
Natural Gas | $1,241 | 148 |
MMBtu
|
$8.39 |
LPG | $23,100 | 3,207 |
MMBtu
|
$7.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,396 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,394 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $206 | $380 |
$206
1,758
kWh
|
|
02 | 2.4226: Use / purchase optimum sized compressor | $2,434 | $2,000 |
$2,434
21,102
kWh
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $93 | $140 |
$93
879
kWh
|
|
04 | 2.2511: Insulate bare equipment | $405 | $43 |
$405
3,517
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,131 | $7,029 |
$3,131
25,205
kWh
|
|
06 | 2.7144: Install spectral reflectors / delamp | $4,373 | $3,675 |
$4,373
34,584
kWh
|
|
07 | 2.7135: Install occupancy sensors | $1,542 | $607 |
$1,542
12,309
kWh
|
|
08 | 2.7134: Use photocell controls | $2,123 | $1,278 |
$2,123
17,292
kWh
|
|
09 | 2.7132: Install timers on light switches in little used areas | $89 | $50 |
$89
586
kWh
|
|
TOTAL RECOMMENDED | $14,396 | $15,202 |
$14,396
117,232
kWh
|
||
TOTAL IMPLEMENTED | $7,394 | $5,908 |
$7,394
60,668
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs