| Assessment Year | 1994 |
|---|---|
| Principal Product | Underground Vaults |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 5,148
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $195,894 | 1,834,994 |
kWh
|
$0.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,748 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,929 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $6,797 | $7,970 |
$6,797
63,599
kWh
|
|
| 02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $11,493 | $4,560 |
$11,493
107,562
kWh
|
|
| 03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,889 | $1,660 |
$3,889
36,342
kWh
|
|
| 04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $2,631 | $386 |
$2,631
24,619
kWh
|
|
| 05 | 2.2511: Insulate bare equipment | $4,870 | $265 |
$4,870
45,721
kWh
|
|
| 06 | 2.3137: Use power during off-peak periods | $7,823 | - |
$7,823
-
kWh
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,132 | $13,324 |
$3,132
27,550
kWh
|
|
| 08 | 2.7144: Install spectral reflectors / delamp | $2,188 | $2,670 |
$2,188
19,343
kWh
|
|
| 09 | 2.7135: Install occupancy sensors | $877 | $920 |
$877
7,620
kWh
|
|
| 10 | 2.7261: Install timers and/or thermostats | $3,048 | $300 |
$3,048
28,429
kWh
|
|
| TOTAL RECOMMENDED | $46,748 | $32,055 |
$46,748
360,785
kWh
|
||
| TOTAL IMPLEMENTED | $9,929 | $21,294 |
$9,929
91,149
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs