Assessment Year | 2001 |
---|---|
Principal Product | envelopes |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
88,000
ft2
|
Annual Production | 870,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,275 | 2,901,750 |
kWh
|
$0.034 |
Electricity Demand | $38,060 | 6,372 |
kW-mo/yr
|
$5.97 |
Natural Gas | $10,974 | 2,237 |
MMBtu
|
$4.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,723 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $7,091 | $4,156 | - | - |
$7,091
-
MMBtu
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,778 | $194 |
$1,445
62,837
kWh
|
$1,333
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,246 | $860 |
$652
28,335
kWh
|
$594
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $248 | $25 |
$129
5,616
kWh
|
$119
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,758 | $8,122 |
$2,449
106,470
kWh
|
$2,309
-
kW-mo/yr
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $3,820 | $4,156 | - | - |
$3,820
-
MMBtu
|
- | - | |
07 | 2.8121: Apply for tax-free status for energy purchases | $2,964 | $200 | - | - | - | - | $2,964 | |
08 | 2.4133: Use most efficient type of electric motors | $1,977 | - |
$1,027
44,647
kWh
|
$950
-
kW-mo/yr
|
- | - | - | |
09 | 2.7233: Use properly designed and sized hvac equipment | $1,674 | $4,000 |
$1,674
72,804
kWh
|
- | - | - | - | |
10 | 4.322: Eliminate old stock and modify inventory control | $16,120 | $25,000 | n/a | - | - | - | $16,120 | - |
TOTAL RECOMMENDED | $42,676 | $46,713 |
$7,376
320,709
kWh
|
$5,305
-
kW-mo/yr
|
$10,911
-
MMBtu
|
$16,120 | $2,964 | ||
TOTAL IMPLEMENTED | $13,723 | $9,376 |
$5,573
242,289
kWh
|
$5,186
-
kW-mo/yr
|
- | - | $2,964 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs