ITAC Assessment: SD0089
ITAC logo
ITAC Assessment: SD0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Molded Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 25,000
ft2
Annual Production 1,056,000
ton
Production Hrs. Annual 2,168
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,540 337,046
kWh
Natural Gas $2,063 278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $838 $1,380 $838
6,741
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $310 $200 $310
2,638
kWh
-
03 2.5115: Reposition oven walls to reduce heated space $777 $100 $777
6,448
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,053 $1,897 $2,053
16,413
kWh
-
05 2.7144: Install spectral reflectors / delamp $1,307 $1,140 $1,307
9,965
kWh
-
06 2.7135: Install occupancy sensors $463 $400 $463
3,517
kWh
-
07 2.7261: Install timers and/or thermostats $1,230 $300 $872
7,034
kWh
$358
-
MMBtu
TOTAL RECOMMENDED $6,978 $5,417 $6,620
52,756
kWh
$358
-
MMBtu
TOTAL IMPLEMENTED $4,508 $4,617 $4,508
35,757
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs