Assessment Year | 1994 |
---|---|
Principal Product | Transducers |
NAICS |
n/a
|
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
200,000
ft2
|
Annual Production | 4,800
pieces
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $579,645 | 6,729,191 |
kWh
|
$0.086 |
Natural Gas | $46,132 | 6,853 |
MMBtu
|
$6.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $218,027 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $218,027 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,963 | $4,300 |
$5,963
69,168
kWh
|
- | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $6,722 | $200 |
$6,722
77,960
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $376 | $235 | - |
$376
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,853 | $150 |
$3,853
44,842
kWh
|
- | |
05 | 2.4323: Use optimum size and capacity equipment | $117,014 | $245,000 |
$117,014
1,358,148
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40,436 | $95,019 |
$40,436
445,193
kWh
|
- | |
07 | 2.7144: Install spectral reflectors / delamp | $39,115 | $43,220 |
$39,115
415,592
kWh
|
- | |
08 | 2.7132: Install timers on light switches in little used areas | $4,548 | $810 |
$4,548
45,721
kWh
|
- | |
TOTAL RECOMMENDED | $218,027 | $388,934 |
$217,651
2,456,624
kWh
|
$376
-
MMBtu
|
||
TOTAL IMPLEMENTED | $218,027 | $388,934 |
$217,651
2,456,624
kWh
|
$376
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs