ITAC Assessment: MA0269
ITAC logo
ITAC Assessment: MA0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cellulose board products
NAICS
n/a
SIC 3111: Leather Tanning and Finishing
Sales Range $50
M
to 100
M
# of Employees 101
Plant Area 153,065
ft2
Annual Production 15,000
ton
Production Hrs. Annual 8,232
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $621,144 5,533,118
kWh
Fuel Oil #6 $464,582 154,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.4133: Use most efficient type of electric motors $6,922 $21,677 $6,922
61,254
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $30,415 $2,000 $30,415
269,637
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $7,598 $5,025 - $7,598
-
MMBtu
04 2.6218: Turn off equipment when not in use $5,885 $100 $5,885
52,169
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $10,655 $15,800 - $10,655
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,620 - $9,620
85,287
kWh
-
TOTAL RECOMMENDED $71,095 $44,602 $52,842
468,347
kWh
$18,253
-
MMBtu
TOTAL IMPLEMENTED $16,542 $21,677 $16,542
146,541
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs