ITAC Assessment: SD0083
ITAC logo
ITAC Assessment: SD0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Small Joint Prosthetics & Passive Motion Devices
NAICS
n/a
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 56,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,167
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,077 842,028
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,108 $100 $1,108
9,672
kWh
02 2.7261: Install timers and/or thermostats $4,183 $320 $4,183
51,583
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $85 $40 $85
879
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,164 $18,442 $7,164
59,496
kWh
05 2.7144: Install spectral reflectors / delamp $15,519 $13,035 $15,519
126,319
kWh
06 2.7132: Install timers on light switches in little used areas $1,046 $240 $1,046
10,844
kWh
07 2.3137: Use power during off-peak periods $424 - $424
-
kWh
08 2.7111: Reduce illumination to minimum necessary levels $2,678 $330 $2,678
21,395
kWh
09 2.7135: Install occupancy sensors $1,928 $2,800 $1,928
19,050
kWh
10 2.7142: Utilize higher efficiency lamps and/or ballasts $748 $385 $748
3,224
kWh
11 2.7132: Install timers on light switches in little used areas $432 $125 $432
3,810
kWh
TOTAL RECOMMENDED $35,315 $35,817 $35,315
306,272
kWh
TOTAL IMPLEMENTED $10,280 $1,540 $10,280
101,407
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs