ITAC Assessment: SD0078
ITAC logo
ITAC Assessment: SD0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Prescision Molded Rubber Seals
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 20,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,382 638,628
kWh
Natural Gas $465 180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,072 $2,240 $1,072
9,379
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,864 $100 $5,864
51,876
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,891 $832 $1,891
16,706
kWh
04 2.2511: Insulate bare equipment $152 $153 $152
1,465
kWh
05 2.7261: Install timers and/or thermostats $1,549 $300 $1,549
13,775
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,867 $2,438 $2,867
24,912
kWh
07 2.7144: Install spectral reflectors / delamp $4,441 $4,196 $4,441
36,635
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $295 $104 $295
2,052
kWh
09 2.7132: Install timers on light switches in little used areas $405 $150 $405
3,224
kWh
10 2.7134: Use photocell controls $247 $115 $247
2,052
kWh
11 2.7135: Install occupancy sensors $1,241 $800 $1,241
10,258
kWh
TOTAL RECOMMENDED $20,024 $11,428 $20,024
172,334
kWh
TOTAL IMPLEMENTED $11,339 $5,682 $11,339
98,477
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs