ITAC Assessment: SD0074
ITAC logo
ITAC Assessment: SD0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 44,000
ft2
Annual Production 600,000
pieces
Production Hrs. Annual 7,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,079 4,180,539
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $5,284 $4,840 $5,284
64,478
kWh
02 2.2437: Recover waste heat from equipment $8,666 $4,290 $8,666
75,322
kWh
03 2.6231: Utilize controls to operate equipment only when needed $4,304 $900 $4,304
52,462
kWh
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,234 $500 $6,234
56,565
kWh
05 2.3137: Use power during off-peak periods $3,428 - $3,428
-
kWh
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,585 $3,235 $17,585
46,893
kWh
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,127 $2,331 $5,127
14,947
kWh
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,233 $7,936 $11,233
33,118
kWh
09 2.9112: Use solar heat to heat water $10,193 $25,487 $10,193
124,560
kWh
10 2.7144: Install spectral reflectors / delamp $3,452 $2,820 $3,452
37,808
kWh
11 2.7135: Install occupancy sensors $1,727 $2,440 $1,727
18,757
kWh
12 2.7142: Utilize higher efficiency lamps and/or ballasts $977 $924 $977
6,448
kWh
13 2.7132: Install timers on light switches in little used areas $3,003 $240 $3,003
15,826
kWh
14 2.7132: Install timers on light switches in little used areas $460 $100 $460
4,982
kWh
15 2.7142: Utilize higher efficiency lamps and/or ballasts $575 $315 $575
2,638
kWh
TOTAL RECOMMENDED $82,248 $56,358 $82,248
554,804
kWh
TOTAL IMPLEMENTED $31,876 $16,869 $31,876
278,721
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs