| Assessment Year | 1994 |
|---|---|
| Principal Product | PVC Pipes |
| NAICS |
n/a
|
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 68 |
| Plant Area |
44,000
ft2
|
| Annual Production | 52,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $760,142 | 9,344,373 |
kWh
|
$0.081 |
| Natural Gas | $14,308 | 2,245 |
MMBtu
|
$6.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $75,573 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $53,662 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $27,894 | $27,500 |
$27,894
342,907
kWh
|
|
| 02 | 2.2511: Insulate bare equipment | $473 | $136 |
$473
5,862
kWh
|
|
| 03 | 2.2424: Use heat in flue gases to preheat products or materials | $15,214 | $24,880 |
$15,214
186,987
kWh
|
|
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $16,815 | $8,515 |
$16,815
206,624
kWh
|
|
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,613 | - |
$8,613
33,705
kWh
|
|
| 06 | 2.7261: Install timers and/or thermostats | $587 | $300 |
$587
7,327
kWh
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $881 | $3,241 |
$881
9,086
kWh
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,220 | $1,800 |
$1,220
13,189
kWh
|
|
| 09 | 2.7132: Install timers on light switches in little used areas | $2,892 | $240 |
$2,892
32,532
kWh
|
|
| 10 | 2.7135: Install occupancy sensors | $723 | $800 |
$723
7,913
kWh
|
|
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $261 | $228 |
$261
2,931
kWh
|
|
| TOTAL RECOMMENDED | $75,573 | $67,640 |
$75,573
849,063
kWh
|
||
| TOTAL IMPLEMENTED | $53,662 | $56,057 |
$53,662
585,874
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs