Assessment Year | 1993 |
---|---|
Principal Product | NYLON CARPETS |
NAICS |
n/a
|
SIC | 2273: Carpets and Rugs |
Sales Range | $5 M to 10M |
# of Employees | 66 |
Plant Area |
n/a
|
Annual Production | 7,920
thousand feet
|
Production Hrs. Annual | 3,788
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $251,604 | 2,674,678 |
kWh
|
$0.094 |
Natural Gas | $518,051 | 129,796 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,347 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,617 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $731 | $750 |
$731
7,913
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,666 | $17,938 |
$6,666
70,926
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,035 | $140 |
$4,035
42,790
kWh
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $149 | $264 | - |
$149
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $6,065 | $800 | - |
$6,065
-
MMBtu
|
- | |
06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $58,730 | $33,300 | - |
$58,730
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,576 | $1,230 |
$2,640
28,136
kWh
|
- | $(-64.0) | |
08 | 2.7144: Install spectral reflectors / delamp | $1,560 | $1,470 |
$1,442
15,240
kWh
|
- | $118 | |
09 | 2.6232: Install set-back timers | $1,458 | $2,000 |
$1,352
14,361
kWh
|
- | $106 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,598 | $852 |
$1,484
15,826
kWh
|
- | $114 | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $779 | $350 |
$370
3,810
kWh
|
- | $409 | |
TOTAL RECOMMENDED | $84,347 | $59,094 |
$18,720
199,002
kWh
|
$64,944
-
MMBtu
|
$683 | ||
TOTAL IMPLEMENTED | $25,617 | $25,794 |
$18,720
199,002
kWh
|
$6,214
-
MMBtu
|
$683 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs