Assessment Year | 1993 |
---|---|
Principal Product | AEROSPACE FASTEN,INSERTS |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 4,488
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $253,170 | 2,303,634 |
kWh
|
$0.11 |
Natural Gas | $3,510 | 499 |
MMBtu
|
$7.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,907 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,839 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $960 | $1,377 |
$960
8,792
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,042 | $20 |
$2,042
18,464
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,909 | - |
$8,556
77,960
kWh
|
- | $(-647.0) | |
04 | 2.7144: Install spectral reflectors / delamp | $17,058 | $5,430 |
$15,287
138,921
kWh
|
- | $1,771 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,135 | $700 |
$764
7,034
kWh
|
- | $371 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $735 | $1,980 |
$498
4,396
kWh
|
- | $237 | |
07 | 2.7261: Install timers and/or thermostats | $22,031 | $300 |
$20,777
189,039
kWh
|
$1,254
-
MMBtu
|
- | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,037 | - |
$5,037
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $56,907 | $9,807 |
$53,921
444,606
kWh
|
$1,254
-
MMBtu
|
$1,732 | ||
TOTAL IMPLEMENTED | $29,839 | $9,507 |
$28,107
255,567
kWh
|
- | $1,732 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs