Assessment Year | 1992 |
---|---|
Principal Product | 3-D WOVEN PRODUCTS |
NAICS |
n/a
|
SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
n/a
|
Annual Production | 500,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $425,895 | 4,300,117 |
kWh
|
$0.099 |
Natural Gas | $222,575 | 58,054 |
MMBtu
|
$3.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,746 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $453 | $2,100 |
$453
4,689
kWh
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $4,453 | - |
$4,453
44,842
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $237 | $200 |
$237
2,345
kWh
|
- | - | |
04 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $1,724 | $10,000 | - |
$1,724
-
MMBtu
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $27,118 | $30,970 |
$32,101
324,150
kWh
|
$(-4,983.0)
-
MMBtu
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $265 | $7,150 | - |
$265
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,680 | $906 |
$1,905
19,343
kWh
|
- | $(-225.0) | |
08 | 2.7123: Keep lamps and reflectors clean | $7,148 | $7,550 |
$6,376
64,478
kWh
|
- | $772 | |
09 | 2.6232: Install set-back timers | $668 | $2,469 |
$668
5,862
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,746 | $61,345 |
$46,193
465,709
kWh
|
$(-2,994.0)
-
MMBtu
|
$547 | ||
TOTAL IMPLEMENTED | $7,756 | $12,825 |
$7,716
77,081
kWh
|
$265
-
MMBtu
|
$(-225.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs