ITAC Assessment: SD0040
ITAC logo
ITAC Assessment: SD0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product 3-D WOVEN PRODUCTS
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $425,895 4,300,117
kWh
Natural Gas $222,575 58,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $453 $2,100 $453
4,689
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $4,453 - $4,453
44,842
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $237 $200 $237
2,345
kWh
- -
04 2.2426: Use waste heat from flue gases to heat space conditioning air $1,724 $10,000 - $1,724
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,118 $30,970 $32,101
324,150
kWh
$(-4,983.0)
-
MMBtu
-
06 2.6212: Turn off equipment during breaks, reduce operating time $265 $7,150 - $265
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,680 $906 $1,905
19,343
kWh
- $(-225.0)
08 2.7123: Keep lamps and reflectors clean $7,148 $7,550 $6,376
64,478
kWh
- $772
09 2.6232: Install set-back timers $668 $2,469 $668
5,862
kWh
- -
TOTAL RECOMMENDED $43,746 $61,345 $46,193
465,709
kWh
$(-2,994.0)
-
MMBtu
$547
TOTAL IMPLEMENTED $7,756 $12,825 $7,716
77,081
kWh
$265
-
MMBtu
$(-225.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs