| Assessment Year | 1992 |
|---|---|
| Principal Product | FIBROUS MATERIALS |
| NAICS |
n/a
|
| SIC | 3296: Mineral Wool |
| Sales Range | $10 M to 50M |
| # of Employees | 87 |
| Plant Area |
n/a
|
| Annual Production | 1,000,000
lb
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $324,836 | 3,328,839 |
kWh
|
$0.098 |
| Natural Gas | $267,760 | 72,937 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $90,019 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,486 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $943 | $4,020 |
$943
9,672
kWh
|
- | - | |
| 02 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $64,662 | $30,000 | - |
$64,662
-
MMBtu
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,542 | $5,000 | - |
$3,542
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $2,021 | $1,042 | - |
$2,021
-
MMBtu
|
- | |
| 05 | 2.2511: Insulate bare equipment | $2,584 | $1,277 | - |
$2,584
-
MMBtu
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $566 | $20 |
$566
5,862
kWh
|
- | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,110 | $2,205 |
$1,110
11,430
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,977 | $1,740 |
$2,301
23,447
kWh
|
- | $(-324.0) | |
| 09 | 2.7123: Keep lamps and reflectors clean | $8,215 | $13,350 |
$6,600
72,978
kWh
|
- | $1,615 | |
| 10 | 2.6232: Install set-back timers | $3,085 | $2,867 |
$2,606
26,671
kWh
|
- | $479 | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,314 | $2,420 |
$543
5,569
kWh
|
- | $771 | |
| TOTAL RECOMMENDED | $90,019 | $63,941 |
$14,669
155,629
kWh
|
$72,809
-
MMBtu
|
$2,541 | ||
| TOTAL IMPLEMENTED | $3,486 | $5,780 |
$3,810
38,981
kWh
|
- | $(-324.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs