ITAC Assessment: UD0296
ITAC logo
ITAC Assessment: UD0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PLASTIC INJECTION MOLDS
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area
n/a
Annual Production 40
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,084 749,414
kWh
LPG $3,200 451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $525 - $733
-
kWh
- $(-208.0)
02 2.3191: Use demand controller or load shedder $2,200 $2,000 $2,200
-
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $700 $80 $640
12,016
kWh
- $60
04 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $600 $5,445 $66
1,172
kWh
$534
-
MMBtu
-
TOTAL RECOMMENDED $4,025 $7,525 $3,639
13,188
kWh
$534
-
MMBtu
$(-148.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs