ITAC Assessment: SD0023
ITAC logo
ITAC Assessment: SD0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product RUBBER PRODUCTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area
n/a
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,375
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,525 1,672,626
kWh
Natural Gas $56,717 12,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,038 $575 $1,038
11,430
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,980 $2,000 $15,980
176,436
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $654 $15 $654
7,327
kWh
- -
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $490 $245 - $490
-
MMBtu
-
05 2.2127: Flash condensate to produce lower pressure steam $1,061 $2,160 - $1,061
-
MMBtu
-
06 2.2113: Repair or replace steam traps $12,496 $830 - $12,496
-
MMBtu
-
07 2.2135: Repair and eliminate steam leaks $9,999 $200 - $9,999
-
MMBtu
-
08 2.6232: Install set-back timers $3,070 $4,050 $3,040
35,756
kWh
- $30
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,607 - $3,946
43,376
kWh
- $(-339.0)
10 2.6231: Utilize controls to operate equipment only when needed $3,353 $200 $3,353
36,928
kWh
- -
TOTAL RECOMMENDED $51,748 $10,275 $28,011
311,253
kWh
$24,046
-
MMBtu
$(-309.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs