Assessment Year | 1992 |
---|---|
Principal Product | FABRICATED METAL PRODUCT |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $50 M to 100M |
# of Employees | 490 |
Plant Area |
n/a
|
Annual Production | 9,200
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $718,081 | 9,108,441 |
kWh
|
$0.079 |
Natural Gas | $58,056 | 11,942 |
MMBtu
|
$4.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,615 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,431 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,880 | $1,817 |
$1,880
23,740
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,846 | $2,000 |
$13,846
175,557
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $591 | $15 |
$591
7,620
kWh
|
- | - | |
04 | 2.2514: Cover open tanks | $516 | $169 | - |
$516
-
MMBtu
|
- | |
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $158 | $138 | - |
$158
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $138 | $122 | - |
$138
-
MMBtu
|
- | |
07 | 2.7123: Keep lamps and reflectors clean | $24,184 | $51,124 |
$21,624
274,326
kWh
|
- | $2,560 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $584 | $999 |
$355
4,396
kWh
|
- | $229 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,496 | $2,200 |
$358
4,689
kWh
|
- | $1,138 | |
10 | 2.7442: Keep doors and windows shut when not on use | $1,222 | - |
$1,222
15,533
kWh
|
- | - | |
TOTAL RECOMMENDED | $44,615 | $58,584 |
$39,876
505,861
kWh
|
$812
-
MMBtu
|
$3,927 | ||
TOTAL IMPLEMENTED | $20,431 | $7,460 |
$18,252
231,535
kWh
|
$812
-
MMBtu
|
$1,367 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs