ITAC Assessment: SD0020
ITAC logo
ITAC Assessment: SD0020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ELECTRIC INSTRUMENTS
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 6,500
pieces
Production Hrs. Annual 3,360
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,782 985,053
kWh
Natural Gas $407 54
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $102 $78 $102
1,172
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,916 $1,632 $5,598
65,651
kWh
$(-1,682.0)
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $294 $100 $294
2,931
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $176 $100 $176
1,758
kWh
- -
05 2.6232: Install set-back timers $3,655 $11,550 $3,277
32,825
kWh
- $378
06 2.7142: Utilize higher efficiency lamps and/or ballasts $791 $666 $518
5,275
kWh
- $273
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,393 - $685
6,741
kWh
- $1,708
TOTAL RECOMMENDED $11,327 $14,126 $10,650
116,353
kWh
$(-1,682.0)
-
MMBtu
$2,359
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs