ITAC Assessment: SD0019
ITAC logo
ITAC Assessment: SD0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MEDICAL DIAG. SUBSTANCES
NAICS
n/a
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,005 3,015,827
kWh
Natural Gas $16,523 2,641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $116 $117 $116
1,465
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $284 $153 $284
3,517
kWh
-
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $1,209 $100 $1,209
15,240
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $3,550 $11,225 $3,550
45,135
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,147 $4,260 $755
9,672
kWh
$2,392
06 2.7123: Keep lamps and reflectors clean $3,776 $11,250 $3,718
41,618
kWh
$58
TOTAL RECOMMENDED $12,082 $27,105 $9,632
116,647
kWh
$2,450
TOTAL IMPLEMENTED $116 $117 $116
1,465
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs