| Assessment Year | 1992 |
|---|---|
| Principal Product | MED. DIAGNOSTIC IMAGING |
| NAICS |
n/a
|
| SIC | 2835: In Vitro and In Vivo Diagnostic Substances |
| Sales Range | n/a |
| # of Employees | 140 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 3,900
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $178,642 | 2,302,462 |
kWh
|
$0.078 |
| Natural Gas | $45,698 | 7,582 |
MMBtu
|
$6.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,774 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,663 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,040 | $742 |
$1,040
13,482
kWh
|
- | - | |
| 02 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $914 | $1,800 | - |
$914
-
MMBtu
|
- | |
| 03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $71 | $1,200 | - |
$71
-
MMBtu
|
- | |
| 04 | 2.6232: Install set-back timers | $7,040 | $8,473 |
$6,414
82,649
kWh
|
- | $626 | |
| 05 | 2.7123: Keep lamps and reflectors clean | $16,709 | $26,424 |
$15,235
196,366
kWh
|
- | $1,474 | |
| TOTAL RECOMMENDED | $25,774 | $38,639 |
$22,689
292,497
kWh
|
$985
-
MMBtu
|
$2,100 | ||
| TOTAL IMPLEMENTED | $18,663 | $28,966 |
$16,275
209,848
kWh
|
$914
-
MMBtu
|
$1,474 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs