ITAC Assessment: SD0014
ITAC logo
ITAC Assessment: SD0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MED. DIAGNOSTIC IMAGING
NAICS
n/a
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range n/a
# of Employees 140
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,900
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,642 2,302,462
kWh
Natural Gas $45,698 7,582
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,040 $742 $1,040
13,482
kWh
- -
02 2.1242: Minimize boiler blowdown with better feedwater treatment $914 $1,800 - $914
-
MMBtu
-
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $71 $1,200 - $71
-
MMBtu
-
04 2.6232: Install set-back timers $7,040 $8,473 $6,414
82,649
kWh
- $626
05 2.7123: Keep lamps and reflectors clean $16,709 $26,424 $15,235
196,366
kWh
- $1,474
TOTAL RECOMMENDED $25,774 $38,639 $22,689
292,497
kWh
$985
-
MMBtu
$2,100
TOTAL IMPLEMENTED $18,663 $28,966 $16,275
209,848
kWh
$914
-
MMBtu
$1,474
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs