ITAC Assessment: OR0756
ITAC logo
ITAC Assessment: OR0756
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Electrical Switchgear
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 92
Plant Area 90,000
ft2
Annual Production 480
units
Production Hrs. Annual 2,250
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,209 480,462
kWh
Electricity Demand $12,317 1,493
kW-mo/yr
Electricity Fees $5,627 -
Natural Gas $9,140 954
MMBtu
Waste Disposal Costs
Water Usage $2,543 422
Tgal
Water Disposal $5,743 422
Tgal
TOTAL YEARLY COSTS $78,579
RECOMMENDED SAVINGS* $124,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,906

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings By-product Production Savings Increase in Production Savings
01 4.122: Develop standard procedures to improve internal yields $73,790 - - - - - - - $73,790
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,116 $120,000 $7,307
89,129
kWh
$2,498
-
kW-mo/yr
$485 $826 - - -
03 4.421: Modify current incentive program $978 - - - - - - $978 -
04 4.231: Purchase equipment instead of leasing $38,280 $221,950 - - - - $38,280 - -
TOTAL RECOMMENDED $124,164 $341,950 $7,307
89,129
kWh
$2,498
-
kW-mo/yr
$485 $826 $38,280 $978 $73,790
TOTAL IMPLEMENTED $84,906 $120,000 $7,307
89,129
kWh
$2,498
-
kW-mo/yr
$485 $826 - - $73,790
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs