Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ELECTRICAL WIRE & TUBE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 329,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,142 2,129,543
kWh
Natural Gas $7,621 1,177
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,884

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $6,376 $287 $6,376
67,409
kWh
- -
02 2.2531: Re-size charging openings or add movable cover or door $1,350 $150 - $1,350
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $851 $825 $851
9,086
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $160 $79
586
kWh
- $25
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,514 $1,760 $603
6,448
kWh
- $911
06 2.6232: Install set-back timers $4,161 $5,550 $3,816
40,445
kWh
- $345
07 2.7123: Keep lamps and reflectors clean $27,392 $31,986 $25,545
270,223
kWh
- $1,847
TOTAL RECOMMENDED $41,748 $40,718 $37,270
394,197
kWh
$1,350
-
MMBtu
$3,128
TOTAL IMPLEMENTED $38,884 $38,808 $36,667
387,749
kWh
- $2,217
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs