*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Printed Carpet
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 110,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 3,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,215 3,487,400
kWh
Electricity Demand $96,031 10,718
kW-mo/yr
Electricity Fees $39,763 -
Natural Gas $687,089 66,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.5192: Modify textile dryers $47,625 $36,000 - - $47,625
-
MMBtu
-
02 2.2314: Replace heat treating oven with more efficient unit $24,860 $28,000 - - $24,860
-
MMBtu
-
03 2.1224: Replace boiler $14,853 $18,000 - - $12,613
-
MMBtu
$2,240
04 2.2163: Use minimum steam operating pressure $1,405 - - - $1,405
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $1,013 $2,000 - - $1,013
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,074 $1,074 $631
14,840
kWh
$443
-
kW-mo/yr
- -
07 2.8114: Change rate schedules or other changes in utility service $4,094 $8,200 - - - $4,094
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,448 $5,454 $925
21,773
kWh
$523
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,690 $6,290 $1,299
30,561
kWh
$391
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $2,071 $11,479 $1,324
31,145
kWh
$747
-
kW-mo/yr
- -
TOTAL RECOMMENDED $100,133 $116,497 $4,179
98,319
kWh
$2,104
-
kW-mo/yr
$87,516
-
MMBtu
$6,334
TOTAL IMPLEMENTED $54,921 $62,297 $4,179
98,319
kWh
$2,104
-
kW-mo/yr
$48,638
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs