ITAC Assessment: SD0011
ITAC logo
ITAC Assessment: SD0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product POWER SUPPLY SYSTEMS
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 388
Plant Area
n/a
Annual Production 65,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $362,583 4,473,036
kWh
Natural Gas $24,375 4,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $20,313 $1,095 $20,313
250,586
kWh
- -
02 2.2511: Insulate bare equipment $138 $190 - $138
-
MMBtu
-
03 2.1221: Replace obsolete burners with more efficient ones $2,086 $2,300 - $2,086
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $874 $1,218 $874
10,844
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,321 $5,670 $1,247
15,240
kWh
- $3,074
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $947 $600 $875
10,844
kWh
- $72
07 2.6232: Install set-back timers $8,496 $7,950 $7,504
92,614
kWh
- $992
08 2.7123: Keep lamps and reflectors clean $37,022 $58,440 $33,363
411,782
kWh
- $3,659
09 2.7142: Utilize higher efficiency lamps and/or ballasts $70 $562 $492
6,155
kWh
- $(-422.0)
TOTAL RECOMMENDED $74,267 $78,025 $64,668
798,065
kWh
$2,224
-
MMBtu
$7,375
TOTAL IMPLEMENTED $70 $562 $492
6,155
kWh
- $(-422.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs