Assessment Year | 1991 |
---|---|
Principal Product | METAL CABINETS & LOCKERS |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 435
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,233 | 944,900 |
kWh
|
$0.092 |
Natural Gas | $47,396 | 9,280 |
MMBtu
|
$5.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $490 | $605 |
$490
5,275
kWh
|
- | - | |
02 | 2.2531: Re-size charging openings or add movable cover or door | $424 | $700 | - |
$424
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,921 | $3,500 | - |
$1,921
-
MMBtu
|
- | |
04 | 2.6232: Install set-back timers | $2,292 | $3,750 |
$2,086
22,567
kWh
|
- | $206 | |
05 | 2.7123: Keep lamps and reflectors clean | $5,786 | $7,500 |
$5,451
59,203
kWh
|
- | $335 | |
06 | 2.7123: Keep lamps and reflectors clean | $405 | $1,672 |
$355
4,982
kWh
|
- | $50 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16 | $21 |
$16
293
kWh
|
- | - | |
08 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $3,470 | $600 |
$3,470
37,515
kWh
|
- | - | |
09 | 2.7492: Use proper thickness of insulation on building envelope | $653 | $1,500 |
$487
5,275
kWh
|
$166
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $15,457 | $19,848 |
$12,355
135,110
kWh
|
$2,511
-
MMBtu
|
$591 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs