| Assessment Year | 1991 |
|---|---|
| Principal Product | ALUMINUM FRAMED DOORS |
| NAICS |
n/a
|
| SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
| Sales Range | $10 M to 50M |
| # of Employees | 260 |
| Plant Area |
n/a
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $186,669 | 1,876,905 |
kWh
|
$0.099 |
| Natural Gas | $122,454 | 51,312 |
MMBtu
|
$2.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $1,090 | $256 | - |
$1,090
-
MMBtu
|
- | |
| 02 | 2.2531: Re-size charging openings or add movable cover or door | $7,229 | $1,500 |
$7,229
72,685
kWh
|
- | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $102 | $80 |
$102
1,172
kWh
|
- | - | |
| 04 | 2.6232: Install set-back timers | $4,991 | $10,350 |
$4,991
50,117
kWh
|
- | - | |
| 05 | 2.7123: Keep lamps and reflectors clean | $4,131 | $9,652 |
$4,131
41,618
kWh
|
- | - | |
| 06 | 2.7123: Keep lamps and reflectors clean | $2,030 | $5,280 |
$2,030
20,516
kWh
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $1,494 | - |
$454
4,689
kWh
|
- | $1,040 | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $1,990 | $600 |
$1,990
19,930
kWh
|
- | - | |
| TOTAL RECOMMENDED | $23,057 | $27,718 |
$20,927
210,727
kWh
|
$1,090
-
MMBtu
|
$1,040 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs