ITAC Assessment: RU0143
ITAC logo
ITAC Assessment: RU0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DIE CAST MOLDS
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 7,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,612 2,654,455
kWh
Natural Gas $18,053 2,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,214

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,359 $5,963 $4,342
46,014
kWh
- $(-983.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $650 $500 - $650
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $1,855 $930 - $1,855
-
MMBtu
-
04 2.7494: Install storm windows and doors $508 $1,100 - $508
-
MMBtu
-
05 2.3191: Use demand controller or load shedder $6,177 $2,500 $6,177
-
kWh
- -
06 2.4133: Use most efficient type of electric motors $4,275 $2,098 $4,275
45,428
kWh
- -
07 2.4312: Improve lubrication practices $10,595 $800 $10,595
112,837
kWh
- -
08 2.8114: Change rate schedules or other changes in utility service $3,706 $4,000 $3,706
-
kWh
- -
TOTAL RECOMMENDED $31,125 $17,891 $29,095
204,279
kWh
$3,013
-
MMBtu
$(-983.0)
TOTAL IMPLEMENTED $5,214 $6,893 $4,342
46,014
kWh
$1,855
-
MMBtu
$(-983.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings