ITAC Assessment: RU0141
ITAC logo
ITAC Assessment: RU0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COMMERCIAL INKS
NAICS
n/a
SIC 2893: Printing Ink
Sales Range $10
M
to 50
M
# of Employees 161
Plant Area
n/a
Annual Production 560
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,688 762,603
kWh
Natural Gas $27,524 4,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,914

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $1,620 $800 $1,620
13,775
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,261 $1,500 $2,480
20,809
kWh
- $(-219.0)
03 2.4133: Use most efficient type of electric motors $653 $632 $653
5,569
kWh
- -
04 2.3191: Use demand controller or load shedder $2,293 $2,500 $2,293
-
kWh
- -
05 2.7224: Reduce space conditioning during non-working hours $2,172 - - $2,172
-
MMBtu
-
TOTAL RECOMMENDED $8,999 $5,432 $7,046
40,153
kWh
$2,172
-
MMBtu
$(-219.0)
TOTAL IMPLEMENTED $2,914 $2,132 $3,133
26,378
kWh
- $(-219.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs