ITAC Assessment: RU0138
ITAC logo
ITAC Assessment: RU0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC FILMS
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,122 1,442,556
kWh
Natural Gas $3,660 575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,857 - $2,857
35,170
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $591 $40 $671
8,206
kWh
$(-80.0)
03 2.4312: Improve lubrication practices $1,884 $800 $1,884
23,154
kWh
-
04 2.4133: Use most efficient type of electric motors $803 $36,020 $803
9,965
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,600 $2,500 $5,600
-
kWh
-
TOTAL RECOMMENDED $11,735 $39,360 $11,815
76,495
kWh
$(-80.0)
TOTAL IMPLEMENTED $4,251 $36,060 $4,331
53,341
kWh
$(-80.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs