Assessment Year | 1997 |
---|---|
Principal Product | Paper |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
125,000
ft2
|
Annual Production | 35,000,000
ton
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,095,657 | 17,065,358 |
kWh
|
$0.064 |
Fuel Oil #6 | $726,901 | 230,354 |
MMBtu
|
$3.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $465,026 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $138,427 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.7211: Modify material application methods | $267,300 | $50,000 | - | - | - |
$267,300
-
lb
|
|
02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $131,859 | $311,500 |
$(-42,966.0)
(-967,175)
kWh
|
$174,825
-
MMBtu
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,705 | $65,650 |
$52,705
1,186,401
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,568 | $31,829 |
$6,568
102,579
kWh
|
- | - | - | |
05 | 3.4145: Use magnetic technology to treat water | $5,865 | $10,640 | - | - |
$5,865
-
gal
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $729 | $1,000 |
$729
16,413
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $465,026 | $470,619 |
$17,036
338,218
kWh
|
$174,825
-
MMBtu
|
$5,865
-
gal
|
$267,300
-
lb
|
||
TOTAL IMPLEMENTED | $138,427 | $343,329 |
$(-36,398.0)
(-864,596)
kWh
|
$174,825
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs