ITAC Assessment: MA0385
ITAC logo
ITAC Assessment: MA0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Paper
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 125,000
ft2
Annual Production 35,000,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,095,657 17,065,358
kWh
Fuel Oil #6 $726,901 230,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $465,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,427

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 3.7211: Modify material application methods $267,300 $50,000 - - - $267,300
-
lb
02 2.2443: Re-use or recycle hot or cold process exhaust air $131,859 $311,500 $(-42,966.0)
(-967,175)
kWh
$174,825
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,705 $65,650 $52,705
1,186,401
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,568 $31,829 $6,568
102,579
kWh
- - -
05 3.4145: Use magnetic technology to treat water $5,865 $10,640 - - $5,865
-
gal
-
06 2.4221: Install compressor air intakes in coolest locations $729 $1,000 $729
16,413
kWh
- - -
TOTAL RECOMMENDED $465,026 $470,619 $17,036
338,218
kWh
$174,825
-
MMBtu
$5,865
-
gal
$267,300
-
lb
TOTAL IMPLEMENTED $138,427 $343,329 $(-36,398.0)
(-864,596)
kWh
$174,825
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs