ITAC Assessment: RU0133
ITAC logo
ITAC Assessment: RU0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CANNED BEVERAGES
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 9,700,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,765 2,146,835
kWh
Natural Gas $78,412 15,212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,491 - $2,491
29,601
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,929 - $3,134
30,188
kWh
- $(-205.0)
03 2.2511: Insulate bare equipment $460 $166 $460
5,569
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $414 - $414
4,982
kWh
- -
05 2.1221: Replace obsolete burners with more efficient ones $7,014 $11,000 - $7,014
-
MMBtu
-
TOTAL RECOMMENDED $13,308 $11,166 $6,499
70,340
kWh
$7,014
-
MMBtu
$(-205.0)
TOTAL IMPLEMENTED $13,308 $11,166 $6,499
70,340
kWh
$7,014
-
MMBtu
$(-205.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs