ITAC Assessment: RU0128
ITAC logo
ITAC Assessment: RU0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PLASTIC CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,985 1,356,975
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,784 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,552 - $1,552
19,050
kWh
02 2.4221: Install compressor air intakes in coolest locations $554 $42 $554
6,741
kWh
03 2.4312: Improve lubrication practices $1,753 $800 $1,753
21,395
kWh
04 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $2,320 - $2,320
28,429
kWh
05 2.2511: Insulate bare equipment $630 $169 $630
7,620
kWh
06 2.2211: Use optimum temperature $4,975 $6,700 $4,975
60,668
kWh
TOTAL RECOMMENDED $11,784 $7,711 $11,784
143,903
kWh
TOTAL IMPLEMENTED $11,784 $7,711 $11,784
143,903
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs