ITAC Assessment: RU0125
ITAC logo
ITAC Assessment: RU0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COATING OF ANODES
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 3,367
pieces
Production Hrs. Annual 2,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $267,113 3,322,978
kWh
Natural Gas $1,816 245
MMBtu
Fuel Oil #4 $43,478 8,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,851 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $376 $231 $376
4,689
kWh
02 2.6232: Install set-back timers $4,619 $1,912 $4,619
57,737
kWh
03 2.7111: Reduce illumination to minimum necessary levels $1,548 - $1,548
19,343
kWh
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,308 - $18,308
-
kWh
TOTAL RECOMMENDED $24,851 $2,143 $24,851
81,769
kWh
TOTAL IMPLEMENTED $24,851 $2,143 $24,851
81,769
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs