ITAC Assessment: RU0116
ITAC logo
ITAC Assessment: RU0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HIGH PRESSURE PIPE FIT'G
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,873 796,893
kWh
Natural Gas $50,734 11,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,737 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2424: Use heat in flue gases to preheat products or materials $8,687 $5,200 - $8,687
-
MMBtu
02 2.8114: Change rate schedules or other changes in utility service $4,716 - $4,716
-
kWh
-
03 2.4312: Improve lubrication practices $1,334 $800 $1,334
8,792
kWh
-
TOTAL RECOMMENDED $14,737 $6,000 $6,050
8,792
kWh
$8,687
-
MMBtu
TOTAL IMPLEMENTED $14,737 $6,000 $6,050
8,792
kWh
$8,687
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs