ITAC Assessment: MZ0325
ITAC logo
ITAC Assessment: MZ0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product domestic and industrial wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 12
Plant Area 100,176
ft2
Annual Production 5,292,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,122 7,596,000
kWh
Electricity Demand $39,952 14,612
kW-mo/yr
Natural Gas $73,412 12,177
MMBtu
Waste Disposal Costs
Water Usage $64,448 10,699
Tgal
TOTAL YEARLY COSTS $575,934
RECOMMENDED SAVINGS* $444,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $163,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $113,192 - $113,192
2,177,000
kWh
- - -
02 2.9114: Use solar heat to make electricty $56,407 $636,000 $56,407
1,084,750
kWh
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $224,497 $226,000 $(-4,338.0)
(-83,432)
kWh
$(-368.0)
-
kW-mo/yr
- $229,203
04 3.4151: Minimize water usage $50,371 $4,080 $(-142.0)
(-2,728)
kWh
$(-25.0)
-
kW-mo/yr
$50,538
-
Tgal
-
TOTAL RECOMMENDED $444,467 $866,080 $165,119
3,175,590
kWh
$(-393.0)
-
kW-mo/yr
$50,538
-
Tgal
$229,203
TOTAL IMPLEMENTED $163,563 $4,080 $113,050
2,174,272
kWh
$(-25.0)
-
kW-mo/yr
$50,538
-
Tgal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs