ITAC Assessment: RU0111
ITAC logo
ITAC Assessment: RU0111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PIPE FITTINGS
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,576 911,782
kWh
Natural Gas $5,020 593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,414 - $3,414
28,136
kWh
02 2.4312: Improve lubrication practices $5,665 $800 $5,665
46,893
kWh
03 2.4133: Use most efficient type of electric motors $2,080 $8,122 $2,080
17,292
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,330 $340 $3,330
27,550
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $475 - $475
3,810
kWh
TOTAL RECOMMENDED $14,964 $9,262 $14,964
123,681
kWh
TOTAL IMPLEMENTED $14,964 $9,262 $14,964
123,681
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs