ITAC Assessment: RU0109
ITAC logo
ITAC Assessment: RU0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FASTENERS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area
n/a
Annual Production 1,560,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,460 2,292,497
kWh
Natural Gas $20,364 3,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,125 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,147 - $2,147
25,791
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,160 $308 $2,160
26,084
kWh
-
03 2.8114: Change rate schedules or other changes in utility service $2,849 $2,500 - $2,849
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $851 $300 $851
10,258
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,456 - $4,456
53,634
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $2,570 $166 $2,570
31,067
kWh
-
07 2.2122: Install / repair insulation on condensate lines $88 $28 - $88
-
MMBtu
08 2.2136: Install / repair insulation on steam lines $374 $180 - $374
-
MMBtu
09 2.1233: Analyze flue gas for proper air/fuel ratio $509 $500 - $509
-
MMBtu
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,121 - $3,113
37,515
kWh
$(-992.0)
-
MMBtu
TOTAL RECOMMENDED $18,125 $3,982 $15,297
184,349
kWh
$2,828
-
MMBtu
TOTAL IMPLEMENTED $18,125 $3,982 $15,297
184,349
kWh
$2,828
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs