ITAC Assessment: RU0108
ITAC logo
ITAC Assessment: RU0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product TEFLON LININGS FOR PIPES
NAICS
n/a
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area
n/a
Annual Production 90,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,245 1,662,954
kWh
Natural Gas $21,689 4,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,573

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $687 $5,000 $687
8,792
kWh
-
02 2.4312: Improve lubrication practices $389 $800 $389
4,982
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $60,583 $122,000 $81,704
1,027,843
kWh
$(-21,121.0)
-
MMBtu
04 2.4133: Use most efficient type of electric motors $1,826 $4,450 $1,826
22,860
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $366 $140 $366
4,982
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $722 $200 $722
9,086
kWh
-
TOTAL RECOMMENDED $64,573 $132,590 $85,694
1,078,545
kWh
$(-21,121.0)
-
MMBtu
TOTAL IMPLEMENTED $64,573 $132,590 $85,694
1,078,545
kWh
$(-21,121.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs