ITAC Assessment: RU0106
ITAC logo
ITAC Assessment: RU0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PRINTING & ENGRAVING
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 384
Plant Area
n/a
Annual Production 130,000,000
pieces
Production Hrs. Annual 0
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,149 2,616,061
kWh
Natural Gas $26,875 4,334
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $798 - $798
8,499
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $648 - $648
7,034
kWh
-
03 2.4312: Improve lubrication practices $507 $800 $507
5,569
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $645 $500 - $645
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,924 - $8,082
86,753
kWh
$(-2,158.0)
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,160 $218 $9,160
98,769
kWh
-
TOTAL RECOMMENDED $17,682 $1,518 $19,195
206,624
kWh
$(-1,513.0)
-
MMBtu
TOTAL IMPLEMENTED $17,682 $1,518 $19,195
206,624
kWh
$(-1,513.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs