ITAC Assessment: RU0103
ITAC logo
ITAC Assessment: RU0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PUMPS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 4,000
pieces
Production Hrs. Annual 4,836
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,222 842,614
kWh
Natural Gas $950 105
MMBtu
Fuel Oil #2 $22,790 5,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $664 $3,750 $664
6,448
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,830 - - $1,830
-
MMBtu
03 2.4312: Improve lubrication practices $857 $800 $857
8,206
kWh
-
04 2.2511: Insulate bare equipment $1,213 $12,352 - $1,213
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $12,768 $133,665 $5,106
49,531
kWh
$7,662
-
MMBtu
TOTAL RECOMMENDED $17,332 $150,567 $6,627
64,185
kWh
$10,705
-
MMBtu
TOTAL IMPLEMENTED $15,262 $137,415 $5,770
55,979
kWh
$9,492
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs