ITAC Assessment: RU0092
ITAC logo
ITAC Assessment: RU0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product METAL LAMINATES
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area
n/a
Annual Production 200,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,240 528,136
kWh
Natural Gas $17,453 3,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $261 $34 $261
2,345
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,505 $500 $1,505
13,775
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,267 $214 $1,267
11,430
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $332 - $332
2,931
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $546 $1,080 $(-113.0)
(-1,172)
kWh
$659
-
MMBtu
06 2.2515: Use optimum thickness insulation $9,910 $80,000 $9,910
89,977
kWh
-
TOTAL RECOMMENDED $13,821 $81,828 $13,162
119,286
kWh
$659
-
MMBtu
TOTAL IMPLEMENTED $12,943 $80,748 $12,943
117,527
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs